Customization: | Available |
---|---|
After-sales Service: | Supplied |
Warranty: | 1 Year |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
MD-750 tracked CBM multi-function drill rig The MD-750 crawler-type coalbed methane multifunctional drilling rig is based on the research and development, manufacturing and practice of drilling machinery by our company for more than 40 years. , widely solicited the opinions of the construction unit in the design, and the newly developed domestic first new type of coalbed methane multifunctional drilling rig with independent intellectual property rights is more suitable China's national coalbed methane drilling rig. The drilling rig is mainly used in coalbed methane exploitation, shallow oil drilling, oil well workover, geothermal water well construction, and can meet the survey and drilling of ultra-deep core holes in China, and can also be used for engineering rescue, mine ventilation holes, drainage Construction of pipelines.
1. The main engine adopts full hydraulic drive, crawler chassis, and has strong off-road performance, which can adapt to the entry and exit construction of various complex roads, with strong climbing ability and low transportation cost.
2. The main engine power adopts dual diesel engine power configuration, which can work at the same time and operate independently, which greatly improves the safety of construction.
3. The rig frame adopts a triangular translation mechanism, which increases the stability of the mast.
4. The drill boom adopts the double-speed mechanism of the mast jacking chain, which has a simple structure, shortens the transportation length and increases the working stroke.
5. The power head adopts a tiltable structure with a maximum tilting angle of 80°; at the same time, the power head adopts a floating spindle structure, which can also translate 850mm, which is convenient for the withdrawal of the drill pipe.
6. The rotation of the drilling rig is driven by a low-speed high-torque motor, with high starting efficiency, the maximum torque can reach 34000N m, and the maximum speed is 170r/min.
7. Unique oil pipe arrangement follow-up system, neatly arranged without interference.
8. The wellhead adopts long-distance hydraulic operation and is equipped with a drill pipe shackle device.
9. The main engine is equipped with a random crane, which is convenient for on-site construction and reduces the labor intensity of construction personnel.
10. Independent operation studio, which can be operated from a long distance and has a superior construction environment.
Power | Weichai WP12.375 | 276kW/2100rpm×2 |
Drilling Capacity ) (drill rod size and drilling depth) |
φ 89mm×9m | 3200m |
φ 114.3mm×9m | 2200m | |
φ 127mm×9m | 1600 m | |
Drill head |
Rotating speed range | Lower speed 0-85rpm Height speed 0~170rpm |
Max,rotation torque of spindle | 34 kN·m [0-85rpm) 17kN·m[0-170rpm) |
|
Screwing off torque | 42 kN·m | |
Spindle dia | φ 75mm | |
Tilting angle | 0°-80° | |
Sliding stroke | 850 m | |
Feeding stroke | 14 m | |
Max.Lifing force | 750 kN | |
Max.lifting speed | 30m/min | |
Max.feeding force | 170 kN | |
Max.feeding speed | 80 m/min | |
Gas testing hoist |
() Lifting force(single rope,bare drum) | 12 kN |
Steel Wire diameter | 8mm | |
Length af steel wire | 1500 m | |
Max.lifting force | 0-280 m/min | |
Mast |
Adjusting angle | 0°-90° |
Drilling angle | 45°~90° | |
() Total length of mast | 19.5 m | |
Hole diameler of the wellhead |
Max.Opening Dia. | φ 650 mm |
Chassis |
Steel crawlers chassi + Two spead motor & reducer of travelling |
Height speod 0~2.4km/h Lower speed 0~1.2km/h |
() Shackles (Optional equipment) |
Max.screwing off tonque | 70kN.m |
Max,screwing on torque | 35kN.m | |
() Crane (Optional equipment) |
() Max.lifting farce(single rope,bare drum) | 30 kN |
Steel wire diameter | φ 10 mm | |
Drum capacity | 120 m | |
() Mod pump (Optional equipment) |
Displacemet | 0-600 L/min |
Working pressure | 0~10 MPa | |
() Foam pump (Optional equipment) |
Displacement | 0-1 L/min |
Others |
Working dimensions | 9500×3200×19500 mm |
Transporting dimensions | 13500×3200×3400 mm | |
Total weight | 55t | |
Power | Weichai WP12.375 | 276kW/2100rpm×2 |
Drilling Capacity ) (drill rod size and drilling depth) |
φ 89mm×9m | 3200m |
φ 114.3mm×9m | 2200m | |
φ 127mm×9m | 1600 m | |
Drill head |
Rotating speed range | Lower speed 0-85rpm Height speed 0~170rpm |
Max,rotation torque of spindle | 34 kN·m [0-85rpm) 17kN·m[0-170rpm) |
|
Screwing off torque | 42 kN·m | |
Spindle dia | φ 75mm | |
Tilting angle | 0°-80° | |
Sliding stroke | 850 m | |
Feeding stroke | 14 m | |
Max.Lifing force | 750 kN | |
Max.lifting speed | 30m/min | |
Max.feeding force | 170 kN | |
Max.feeding speed | 80 m/min | |
Gas testing hoist |
() Lifting force(single rope,bare drum) | 12 kN |
Steel Wire diameter | 8mm | |
Length af steel wire | 1500 m | |
Max.lifting force | 0-280 m/min | |
Mast |
Adjusting angle | 0°-90° |
Drilling angle | 45°~90° | |
() Total length of mast | 19.5 m | |
Hole diameler of the wellhead |
Max.Opening Dia. | φ 650 mm |
Chassis |
Steel crawlers chassi + Two spead motor & reducer of travelling |
Height speod 0~2.4km/h Lower speed 0~1.2km/h |
() Shackles (Optional equipment) |
Max.screwing off tonque | 70kN.m |
Max,screwing on torque | 35kN.m | |
() Crane (Optional equipment) |
() Max.lifting farce(single rope,bare drum) | 30 kN |
Steel wire diameter | φ 10 mm | |
Drum capacity | 120 m | |
() Mod pump (Optional equipment) |
Displacemet | 0-600 L/min |
Working pressure | 0~10 MPa | |
() Foam pump (Optional equipment) |
Displacement | 0-1 L/min |
Others |
Working dimensions | 9500×3200×19500 mm |
Transporting dimensions | 13500×3200×3400 mm | |
Total weight | 55t |