1. Equipped with a 65KW brand turbocharged engine with strong power.
2. Patented design compound boom, double cylinder lifting.
3. Each drilling rig is equipped with a baffle on the main arm to protect the oil cylinder.
4. Parallel transmission design, independent oil pump, sufficient power, reasonable distribution, unique hydraulic system design, simple maintenance and low cost.
5. Dual systems can be added:
1. Air power system with air compressor
2. Mud pump system with mud.
1.Dual motor rotating mechanism
2.Centralized operating system
3.Double cylinder propulsion system
4..Latest hydraulic technology, assorting with the high torque rotary hydraulic motor and the large diameter hydraulic cylinder propulsion, greatly reduce the labor intensity, shorten the auxiliary time, improve the efficiency of construction and engineering quality
5.stable traveling system
6.Triple pump assemble
Drilling depth |
200m |
Using air
consumption |
1.7-3.5 MPA |
Drilling diameter |
140-350mm |
Air consumption |
17-36 m³/min |
Drill pipe diameter |
φ89 φ102 φ114mm |
Rig lifting force |
25 ton |
Drill pipe length |
1.5m/2.0m
3.0m/6.0m |
weight |
9400kg |
Engine&power |
Weichai 103kw |
Dimension |
5950*2100*2600mm |
Power head device
Power head device, gearbox integrated casting, dual motor power, torque, durability, small maintenance costs;
Hydraulic oil pump
Hydraulic oil pump; parallel gearbox design (patent) oil pump monomer separation, power supply adequate distribution reasonable,
hydraulic system unique design, simple maintenance, small cost;
Tower
Lifting force; patent design composite big arm, big arm small volume, long stroke, double cylinder lifting, lifting tonnage; Each drill hoist arm is installed limiter, protect the cylinder safety, ensure the safety of work; Each hydraulic tubing is covered with a protective sleeve, so that the tubing life longer..